Geology and history

Geology

  • Oil resources in the Basker and Manta Fields comprise stacked pay in numerous thin sands within the Latrobe Group with multiple contacts and trapped by internal seals. The sands are typically good reservoir quality.
  • Gas resources in the BMG Fields comprise both associated and non-associated gas in the Latrobe sands and non-associated gas in the deeper Golden Beach zones. Golden Beach sands are generally of modest reservoir quality.
  • Most oil-bearing zones contain a light (40o API), high GOR fluid. Gas bearing zones at Basker and Manta typically contain wet gas.

Development plan and activities

  • The BMG oil and gas fields produced oil from five wells (Basker-2, -3, -5, -6 and Manta-2A).
  • Development wells are connected to a subsea manifold at a water depth of 158 metres, which is tied back to the FPSO “Crystal Ocean" by subsea flowlines. Production capacity is about 25,000 BOPD.
  • Oil is transferred from the FPSO by flowline to the shuttle tanker “Basker Spirit", which stores and transports oil to refineries in Victoria or by ship-to-ship transfer into the export market.
  • In November 2010, production operations utilising the Crystal Ocean and the Basker Spirit were suspended as a consequence of preparations to move into a non-production phase.

History

  • In 2H 2008, ROC acquired its interests in the Gippsland Basin via acquisition of Anzon Australia Limited.
  • ROC's Gippsland Basin producing asset comprised a 40% operating interest in VIC/L26, VIC/L27 and VIC/L28 which includes the Basker-Manta-Gummy ("BMG") Oil and Gas Fields.  Effective 1 April 2009, ROC sold a 10% participating interest to PT Pertamina Hulu Energi Australia Pty Ltd.  The sale was completed in August 2009.
  • The Basker field was discovered in 1983, Manta in 1984 and Gummy in 1990. 3D seismic was acquired in 1996. Five development wells (four producers and one gas injector) were drilled from September 2005 to May 2006. Full production commenced in December 2006.
  • Cumulative production to end-2007 was over three million barrels at an average rate of 8,700 BOPD. Peak production rates have reached in excess of 15,000 BOPD.
  • An oil producer was drilled in 2008 and production from the well commenced in September 2008.  Basker-7 was drilled, completed and successfully brought online as a producer in 4Q 2009.
  • A low pressure flare recovery compressor package (to supplement the re-injection of produced gas) was installed on the Crystal Ocean FPSO in 4Q 2009.
  • Activities to enter the field into a Non Production Phase were concluded in 2Q 2012.

JV participants and interests

Roc Oil (Vic) Pty Limited (Operator)  30% 
Beach Energy Limited 30%
CIECO Exploration and Production (Australia) Pty Ltd 20%
Sojitz Energy Australia Pty Ltd 10%
Pertamina Hulu Energi Australia Pty Limited 10%

 

Share Price

ASX(A$)Price image (ASX)

Price updates are delayed by 20 minutes and are subject to ASX trading hours

Go to Investor Centre

Working with the fishermen

Working with the fishermen

Engaging with fishing communities and consulting with them on a routine basis...

Read more

2009 Sustainability Report

(1.8mb)


Download it here